Emergency? Call 999

For general enquiries

Contact Us

Latest Incidents

11th February, 2024 - 12.57pm: We were called to the M4 westbound between J15 and J16 for a car well ...Read more

10th February, 2024 - 2.23pm: We were called to assist two people who were stuck about 10m above the...Read more

8th February, 2024 - 1.59pm: A large quantity of food grade golden syrup was spilled on the road. T...Read more

6th February, 2024 - 09.16: Fire crews from Stratton St Margaret and Swindon were called to a dome...Read more

Residential buildings with two or more domestic premises

The Responsible Person(s) for any multi-occupied residential buildings, of two or more sets of domestic premises must meet the following requirements.

Fact sheets in support of the above have been produced by the Government and can be found at www.gov.uk/government/publications/fire-safety-england-regulations-2022

Fire Risk Assessment Prioritisation Tool

A new Fire Risk Assessment Prioritisation Tool has been designed to help Responsible Persons. It can be used to develop a strategy to prioritise buildings and review fire risk assessments, to ensure the new clarifications outlined in the Fire Safety Act have been taken into account.

This approach is also designed to ensure that competent professionals who have the required skills to assess external walls (such as fire engineers, fire risk assessors, surveyors, or architects) prioritise their resources to buildings identified as high priority.

The Fire Risk Assessment Prioritisation Tool does not constitute a fire risk assessment in itself, nor does it remove the need or requirement for both FRSs and Responsible Persons to act upon known or suspected risk in all premises.

The online tool can be found at https://bpt.homeoffice.gov.uk/

results found.

Name:
Post Holders:
Grade: